NB Power Home  |   Site Map  |       
 
   Residential   |   Business   |   Regulatory Information
   Safety   |   XCord's Game Zone   |   Energy Savings   |   Environment   |   Education   |   Renewable Energy
   General Inquiries   |   Payment Locations   |   Report an Outage   |   Offices   |   Stations   |   Media
   About Us   |   Media   |   Supply Chain   |   Careers
   Holding   |   Generation   |   Nuclear   |   Transmission   |   Distribution and Customer Service
 
 
Home
 
Rates, Schedules and Policies Manual
 
 
I. Extension of Facilities - Underground RSP I-3
 
table of contents | back          i1 | i2 | i3    next
 
Extensions cont'd  
   

The NB Power investment is equal to the total estimated cost of the equivalent standard overhead facilities less any customer contribution towards those facilities.

The optional facility charge includes the incremental cost of padmounted transformation, if required. An exception is when NB Power approves a transformer rated at 500 kVA or greater.

Optional
Underground
Facilities
Charge cont'd




 

NB Power or its contractor installs the facilities.

NB Power provides the electrical design, standard electrical installation material (primary and secondary conductor, connectors, transformation and associated protective equipment), and inspection and supervision services required to meet NB Power's Standard Construction Practices manual, applicable CSA Standards, and municipal bylaws and regulations.

When complex conduit systems are specified in the design, customers must have the installation designed by qualified designers and approved by NB Power. The customer must provide as built drawings upon completion of the work and prior to service connection. The customer is responsible for the cost of the design work.

NB Power assumes ownership and responsibility for customer provided equipment that meets NB Power's Standard Construction Practices manual, applicable CSA Standards, and municipal bylaws and regulations, after one year from the date of installation, excluding service loops and streetlighting systems.

Installation
Design, Material
and Inspection





 
Applicants are expected to pay the full amount of the contribution in advance. Acceptable forms of payment include certified cheque, bank draft or cash. The exception is municipal, provincial or federal government departments which provide letters of intent. Payment of
Customer
Contribution
 
table of contents | back          i1 | i2 | i3    next
disclaimer | NB Power - RSP 1 October 2000

 
 
 
 
 
Advanced Search
  Customer Service Policies
  Media
  Tenders
  Careers
  Outage Information
  A. Introduction
  B. Definition of Terms
  C. Authority, Authorizations and Contracts
  D. Provision of Service
  E. Security Deposits
  F. Billing and Payments
  G. Services Available to Customers
  H. Extension of Facilities - Overhead
  I. Extension of Facilities - Underground
  J. Optional Facilities
  K. Connection of Customer Facilities
  L. Use of Service
  M. Disconnection of Service
  N. Rate Schedules and Rate Application Guidelines
  O. Fees and Charges
 
 
 
 
 
  © 2007 Énergie NB Power   |   Privacy Policy