|
N. Rate Schedules and Rate Application Guidelines
|
RSP N-21
|
|
| |
|
|
table of contents | back
n1 | n2 | n3
| n4 | n5 | n6
| n7 | n8 | n9
| n10 | n11 |
n12 | n13 | n14 |
n15 | n16 | n17 |
n18 | n19 | n20 |
n21 | n22| n23 |
n24 | n25 | n26 |
n27
|
next |
| |
|
Short Term Unmetered Rate Schedule
|
|
|
That category of Customers in all areas served by NB Power requiring
single-phase and three-phase installa- tions and connected for no longer than
one (1) month. The installation will not be metered.
Rate
| Connection Charge: |
Single-Phase |
Three-Phase |
| A. Connection to existing secondary voltage |
$78.15 |
$78.15 |
| |
|
|
B. Where transformer installations are required, the following
connection charges will apply: |
(1) to and including
10 kVA
|
$113.97 |
$160.17 |
| (2) 11 kVA to 15 kVA |
$184.38 |
$230.48 |
| (3) 16 kVA to 25 kVA |
$206.13 |
$257.77 |
| (4) 26 kVA to 37 kVA |
$230.48 |
$257.77 |
| (5) 38 kVA to 50 kVA |
$257.77 |
$257.77 |
| (6) 51 kVA to 75 kVA |
$283.00 |
$401.23 |
| (7) 76 kVA to 125 kVA |
$330.10 |
$425.44 |
| (8) Above 125 kVA |
--
|
$455.57 |
Energy Charge:
11.74¢ per kWh of estimated consumption. |
|
|
| |
|
|
table of contents | back
n1 | n2 |
n3 | n4 | n5 |
n6 | n7 | n8 |
n9 | n10 | n11 |
n12 | n13 | n14 |
n15 | n16 | n17 |
n18 | n19 | n20 |
n21 | n22| n23 |
n24 | n25 | n26 |
n27
|
next |
|
|
|
|
|