N. Rate Schedules and Rate Application Guidelines RSP N-22
 

table of contents | back

n1 | n2 | n3 | n4 | n5 | n6 | n7 | n8 | n9 | n10 | n11 | n12 | n13 | n14 | n15 | n16 | n17 | n18 | n19 | n20 | n21 | n22| n23 | n24 | n25 | n26 | n27

next
 
Short Term Unmetered Rate Application Guidelines
Available to serve such events as carnivals, bazaars, and unmetered installations.

Connected for no longer than one (1) month.

When the service exceeds one month, the installation will be billed and the remaining time considered as a new installation.

When meters are involved, and not disconnected, a reading will be taken and the kilowatt hours noted for record purposes only.

When poles or additional equipment other than the transformer installation are required, the installation and removal charges will be estimated and collected before work commences. Customers who have a credit history, acceptable to NB Power, may be billed using a Form 232, Customers Contribution Estimate.

 
Electricity consumption is estimated by multiplying the connected load in kW (or kVA times 0.9), times the hours of usage. For example, a carnival with a connected load of 25 kVA operates 12 hours per day for 10 days has an estimated consumption calculated as follows:

25 kVA x 0.9 power factor x 12 hours x 10 days = 2,700 kWh.

If conditions are such as to cause reasonable doubt concerning the connected load, recording equipment will be installed to determine the kVA connected load.

Estimating
Consumption
 

table of contents | back          

n1 | n2 | n3 | n4 | n5 | n6 | n7 | n8 | n9 | n10 | n11 | n12 | n13 | n14 | n15 | n16 | n17 | n18 | n19 | n20 | n21 | n22| n23 | n24 | n25 | n26 | n27

next
disclaimer | NB Power - RSP 17 November 2000

 
 
 
 
 
Advanced Search
  Customer Service Policies
  Media
  Tenders
  Careers
  Outage Information
  A. Introduction
  B. Definition of Terms
  C. Authority, Authorizations and Contracts
  D. Provision of Service
  E. Security Deposits
  F. Billing and Payments
  G. Services Available to Customers
  H. Extension of Facilities - Overhead
  I. Extension of Facilities - Underground
  J. Optional Facilities
  K. Connection of Customer Facilities
  L. Use of Service
  M. Disconnection of Service
  N. Rate Schedules and Rate Application Guidelines
  O. Fees and Charges
 
 
 
 
 