H. Extension of Facilities - Overhead


Rate Schedules and Policies Manual

H. Extension of Facilities - Overhead

RSP H-2

table of contents | back h1 | h2 | h3 | h4 | h5 | h6

next

Extensions (con't)

  • If NB Power requires space for transformers, switches or other facilities of any kind in order to provide service to the Customer, the Customer will furnish free of charge adequate space for and acceptable access to this equipment. The Customer is restricted from placing permanent structures within this place.

Conditions for
Overhead
Extension
cont'd

 

Standard facility allowances by Rate Category are specified as follows:

Residential (Urban, Rural and Seasonal):
NB Power supplies at no charge to the Customer up to 90 meters of single-phase overhead service and the required transformation and metering for each Customer eligible for a Residential Service Rate Category. Measurement of the distance starts from the Customer's approved Delivery Point. Delivery is at an NB Power standard service voltage and Delivery Point as specified in Section K - Connection of Customer Facilities.

General Service and Small Industrial Rate Categories:
NB Power supplies at no charge to the Customer the required transformation, metering and up to 90 meters of single-phase or three-phase overhead service. Measurement of the distance starts from the Customer's approved Delivery Point. Delivery is at an NB Power standard service voltage and Delivery Point as defined in Section K - Connection of Customer Facilities.

Large Industrial:
For Large Industrial Customers served from the transmission system refer to Section N, Large Industrial Rate Schedule.

For Large Industrial Customers served from the distribution system, NB Power supplies at no charge to the Customer primary metering and up to 90 meters of three-phase overhead primary service.

Measurement of the distance starts from the Customer's approved Delivery Point. Delivery is at an NB Power standard service voltage and Delivery Point as defined in Section K - Connection of Customer Facilities.

Standard
Facility
Allowance