Skip to main content
Search Menu

News & Media Centre

Latest News

Point Lepreau Nuclear Generating Station reconnects to the grid

December 01, 2021

Fredericton, N.B. – Point Lepreau Nuclear Generating Station (PLNGS) reconnected to the New Brunswick grid yesterday, November 30, 2021.   

 

About the Point Lepreau Nuclear Generating Station 

The Point Lepreau Nuclear Generating Station is a 660 megawatt (net) nuclear generating station and a base load contributor to the New Brunswick electrical grid. It produces enough non-emitting electricity …

Read More

Media Inquiries

Media inquiries relating to power outages: (506) 458-2345 

Customer inquiries or to report power outages or emergencies: 1 800 663-6272