Skip to main content
Search Menu

Due to a planned technical upgrade, our self-serve options will be unavailable from 5:00 p.m. Friday, May 16 until 11:00 p.m. Monday, May 19, both on the phone and through your online NB Power account. You will not be able to access your account balances or payment arrangement information. We apologize for any inconvenience. You can still call to report an outage or message us on social media for other questions!

The independent Residential Billing and Metering assessment is complete. The full report is available here

News

Point Lepreau Nuclear Generating Station Update

2022-08-03


Fredericton, N.B. –The Point Lepreau Nuclear Generating Station (PLNGS) was taken offline yesterday in response to an equipment issue. Further assessments are underway to perform maintenance required in order to reconnect the Station to the grid.  This work poses no risk to employees, the public or the environment.

About the Point Lepreau Nuclear Generating Station 

The Point Lepreau Nuclear Generating Station is a 660 megawatt (net) nuclear generating station and a base load contributor to the New Brunswick electrical grid. It is a major component of NB Power’s generating assets and contributes to NB Power sourcing approximately 80 per cent of the electricity used in New Brunswick from clean, renewable, or non-emitting sources.  In 2021/22, it represented approximately 46 per cent of the total net generation from NB Power generating stations, with a net capacity factor of approximately 88 per cent.

MEDIA CONTACT:   Dominique Couture, Communications, (506) 458-2345 or DCouture@nbpower.com