Skip to main content

Electrical Wiring Permit Application

Utility Information

Is electrical utility involvement required on site?


Site Information

Construction
Permit Type
Permanent
Temporary
Disconnect/Reconnect
E-Tag #:
Emergency Repair
E-Tag #:
Other
Quantity:


Electrical Contractor / or Sign Contractor



Electrician / or Sign Installer (on site)

Property Address

Please provide the address:

 
Is this for a Prefab Building?


Owner Information

Property Owner

Does property Owner Address differ from the Property Address?

Please provide the address:

 

Building Owner

Please provide the address:

 


Does the occupancy owner differ from the building owner?

Occupancy Owner

Please provide the address:

 


Service Information

Overhead/Underground
New Service/Existing Service
Phase
Meter Mounted Device
Generator Transfer Switch Installed

Complete only for new sub-metering, branch circuits with no change to main service



Feeder/Sub Meter Quantity Volts Amps Phase




Energy Device

If this permit will apply to any of the following devices, please provide the requested details:

Device
Generation
Solar PV - Capacity (kW)
Wind - Capacity (kW)
Hydro - Capacity (kW)
Fossil Fuel - Capacity (kW)
Other - Capacity (kW)
Electrical Vehicle/Charger
Level Two - Capacity (kW)
Level Three - Capacity (kW)
Storage/Battery
Maximum continuous power - Capacity (kW)
Total usable energy - Capacity (kW)


Attachments



Payment Options

Please choose the payment option that best suits you and an email notification with payment instructions will follow once your application has been processed
Please select a payment method:
Have you filled out the NB Power pre authorized debit form?

Since you are not set up for PAD and to avoid delays in processing your application, we would recommend that you select another payment option.

You can find our PAD form on our landing page.



Further instructions will be provided to you in your email notification.

Declaration

By submitting this application I accept responsibility and declare that all the information contained herein is accurate to the best of my knowledge and that I or a qualified employee under proper supervision will be performing the work in accordance with the Canadian Electrical Code, provincial regulations and Service Entrance Standards; AND I understand that this application is subject to additional terms and conditions as deemed necessary at the sole discretion of the inspection department and that special inspection fees can be applied whenever wiring is commenced prior to this permit being issued; AND I further acknowledge that temporary wiring permits will expire after six month without notice, that all construction points shall be called-in for inspection and that failure to comply will result in utility services being delayed or disconnected subsequent to e-mail, mail, or verbal notification.